0141 887 0700

john@vital-comms.co.uk

Case Study 2

The SSE Hydro is which opened in September 2013 has a capacity to contain 13000 people.

It is a fast moving environment where clear and efficient communications are a necessity

Vital Comms (Scotland) Ltd were chosen to supply the solution.

With around 200 radios on the system and multiple talk groups required over 3 sites a MOTOTRBO Linked Capacity Plus System was chosen.

This solution offered the benefit of linking The Hydro t the SECC and The Clyde Auditorium known to many Glaswegians as The Armadillo on one seamless system.

Multiple talk groups can speak simultaneously and communicate by TEXT message.

The solution also offers connectivity with telephone systems, Fire Alarm systems and Building Management Systems

For safety man down alarms and GPS tracking are also available.